All humanoid robots
Industrial humanoidCurrent Mk1 order availability not verified

Phantom Mk 1

FFI
Foundation Future Industries

United States · Reviewed 2026-10-11

Foundation's timeline distinguishes a wheeled Phantom Mk1 built in December 2024 from the bipedal Mk1.1 that took its first steps in March 2025. The current Phantom product page does not identify which revision its specifications describe.

Published offer

Price not verified

Availability: Current Mk1 order availability not verified

Archived Foundation promotional portrait. The pictured hardware revision is not identified.

01 / At a glance

Understanding Phantom Mk 1

Intended applications

Industrial work described by the manufacturer; reported customer pilots do not establish general commercial availability

02 / Hardware profile

Phantom Mk 1 specifications

Category
Industrial humanoid
Commercial status
Prototype and customer pilot history
Availability
Current Mk1 order availability not verified
Country of origin
United States
Use cases
Industrial work described by the manufacturer; reported customer pilots do not establish general commercial availability

03 / Pricing and purchasing

Published offers and availability

No numerical offer recorded

Contact Foundation Future Industries for a written quotation for the exact configuration, including delivery, support and any software access fees.

04 / Technical analysis

Phantom Mk 1 engineering analysis

How do Phantom Mk1 and Mk1.1 differ in mobility evaluation?

Foundation's timeline distinguishes a wheeled Phantom Mk1 from a later bipedal Mk1.1. Claims about locomotion, base stability and energy use therefore depend on which prototype is being described. A robot operating on wheels cannot be used as evidence of successful stair climbing or sustained biped control. Camera and manipulation results may also depend on changes between hardware revisions.

Configuration and hardware details

01

Phantom Mk1 and Mk1.1 describe different mechanical milestones

Foundation's historical record separates the wheeled Phantom Mk1 built in December 2024 from the bipedal Mk1.1 that walked in March 2025. A catalog entry that mixes photographs of these versions risks making wheels and legs appear simultaneous on one product. The reader should know which platform performed a task before interpreting its physical reach, mobility or autonomy.

For each reported pilot or demonstration, record the model suffix, whether it used a fixed or mobile base, who operated the arms and which evidence supports a delivered robot rather than an announcement. A first-step demonstration proves an early walking capability under its conditions; it does not establish sustained industrial walking or an orderable Mk1 retail specification.

Hands-on technical guide

Phantom Mk 1: ordering, setup and first controlled test

Commissioning checklist; examples have not been tested on physical hardware by TechniaHQService.

What to order and verify
Catalog access: Current Mk1 order availability not verified. Request a written quote or order confirmation from Foundation Future Industries for Phantom Mk 1 with hardware revision, charger, controller, supported accessories, import/shipping costs, warranty, software entitlement and training. Do not treat a price listing as a delivery guarantee.
Software and equipment
Obtain the model-specific operator manual, controller application, firmware compatibility matrix and developer package from Foundation Future Industries. No public installer or SDK is confirmed in this model's catalog record.

Phantom Mk 1 workflow

  1. 01Order / accessPhantom Mk 1
  2. 02SoftwareManufacturer-approved package
  3. 03Initial checkRead-only diagnostics
  4. 04Acceptance testSupervised exercise
Conceptual workflow for the exercise below. This is an explanatory diagram, not an electrical wiring schematic or proprietary controller blueprint.

Step-by-step setup and first exercise

  1. 01

    Get the unit and files

    Use the manufacturer's sales or partner channel to confirm the serial configuration, supported software and contents of the delivery.

  2. 02

    Install the approved software

    Obtain the model-specific operator manual, controller application, firmware compatibility matrix and developer package from Foundation Future Industries. No public installer or SDK is confirmed in this model's catalog record. Install on the supported host OS and verify the release/build number. Do not use packages intended for another robot.

  3. 03

    Startup and stop check

    Follow the supplied power-on order; inspect battery, joints, cables and controller warnings. Verify the approved emergency stop and initial posture before allowing motion. Keep the test space clear.

  4. 04

    First exercise

    Verify the Mk1's exact delivery and support contract; ask for a documented industrial station acceptance run with one item class.

  5. 05

    Firmware and software updates

    Compare the current serial/model, controller and firmware versions against the manufacturer's release notes. Export configuration and logs and check recovery options. Obtain the correct signed package or managed update; use the specified power and network conditions. Test stop controls and the same acceptance exercise after updating. If no authorized firmware path exists, do not flash the robot.

  6. 06

    Walking, running and dancing

    Only request a supported standing, walking or performance preset from the manufacturer. For a custom dance or run, obtain the exact joint model and validated controller, retarget motion in simulation, constrain joint position, speed, torque and contacts, then use vendor-supervised reduced-speed commissioning. No running or dance capability is implied by this procedure.

Troubleshooting

Controller cannot establish a connection
Verify the host OS, firmware compatibility, authorized account and network setup using the exact delivered manual; do not bypass safety or authentication.
Motion differs from the acceptance exercise
Stop using the approved control, record the exact fault and verify actuator/joint configuration and software revision before repeating.

Capabilities and limits

The acceptance exercise is a proposed commissioning check, not a measured performance result or proof of support for custom locomotion.

Community ratings

Phantom Mk 1 Reviews & Ratings

Hands-on community feedback is moderated before publication. Technical sub-ratings are optional.

—

0.0(0 reviews)
5 star
0%
4 star
0%
3 star
0%
2 star
0%
1 star
0%

Published reviews

0 total

No published reviews yet

Be the first to submit hands-on feedback for moderation.

06 / References

Phantom Mk 1 sources

The manufacturer timeline identifies the Mk1 and Mk1.1 revisions. Dimensions remain blank because the current generic Phantom page does not assign them to the retained Mk1 record. Its conflicting payload entries are not repeated. Reported pilot history is attributed to Foundation.

  • Foundation Phantom product page (manufacturer)
  • Foundation development timeline (manufacturer)