Two operational reports are shown separately. Neither provides a complete split of time spent working, waiting or charging.
Visible rows
2
Dataset scope
TechniaHQRobot source-linked dataset
Interactive infographic
Humanoid Robot Operating Windows and Shift Reports
Two operational reports are shown separately. Neither provides a complete split of time spent working, waiting or charging.
Figure 02
State
Scheduled production shift
Reported duration
Scheduled 600 minutes
Field or simulation
Field deployment report
Task
Sheet-metal loading
Environment
BMW production line
Figure reports 10-hour shifts Monday through Friday. The source does not publish the split between work, movement, waiting, charging or interventions.
Read source ↗
AGIBOT humanoid fleet (models not specified)
State
Reported factory operation across multiple robots
Reported duration
More than 3,840 minutes
Field or simulation
Documented field operation
Task
Four or more factory workflows
Environment
Longcheer consumer-electronics factory
The June 29 report gives more than 64 hours across the operation. Exact start/end dates, per-robot hours and time spent charging or under intervention are not disclosed.
Read source ↗
Accessible data table
Source-linked data used in the infographic
Robot
State
Start
End
Duration (minutes)
Field or simulation
Record notes
Evidence
Source
Figure 02
Scheduled production shift
Not recorded
Not recorded
Scheduled 600 minutes
Field deployment report
Figure reports 10-hour shifts Monday through Friday. The source does not publish the split between work, movement, waiting, charging or interventions.
Official announcement
Figure official BMW production reportPublished 2025-11-19Checked 2026-07-31
AGIBOT humanoid fleet (models not specified)
Reported factory operation across multiple robots
Not recorded
Not recorded
More than 3,840 minutes
Documented field operation
The June 29 report gives more than 64 hours across the operation. Exact start/end dates, per-robot hours and time spent charging or under intervention are not disclosed.
Official announcement
AgiBot official Longcheer factory-operation reportPublished 2026-06-29Checked 2026-10-11
Methodology
How the dataset is built
Published observation windows and scheduled shifts are included, but they are not converted into a 24-hour state breakdown. Work, travel, waiting, charging, maintenance and intervention shares remain unavailable unless a source publishes them.
Editorial analysis
A scheduled shift is not continuous productive time
The Figure 02 record describes a scheduled ten-hour production shift. The table does not divide that time into handling, movement, waiting, charging or recovery. Treating every scheduled minute as useful output would introduce an unsupported utilization figure.
A fleet observation is a different unit
The AGIBOT record concerns a multi-workflow factory operation lasting more than 64 hours. It is a lower-bound report about a fleet operation, not a measured duty cycle for one robot. The two records therefore remain separate.
How to measure an operating cycle
For one defined session, timestamp each state transition and make the state categories mutually exclusive. Record interruptions and whether charging overlaps with replacement hardware. Useful work time divided by the chosen session duration can then support a utilization calculation.
Frequently asked questions
Can these two reports establish utilization percentages?
No. Neither provides the required breakdown of time by operational state.
Sources
Figure official BMW production report
AgiBot official Longcheer factory-operation report